Swindon Honda Logistic

Pallet Racking Job For Honda Logistic

CONTACT US TODAY

Swindon Honda Logistic

The Challenge

This pallet racking project was a bonus for us being in Swindon, just 10 miles away from where we are based.
The project consisted of over 1000 10m frames and thousands of beams. It also has the same amount of timber decks to match.

The Solution

We completed this in 3 weeks, very good going for such a big pallet racking project.
All floor studs cut and all of the racking transported off site within the time period given.
Although our projects that we have used for our case studies look huge, we do also carry out hundreds of smaller projects.