The Challenge

This mezzanine was a one in a million mezzanine floor, being 5000sqm it was one of the biggest mezzanine projects we have been lucky enough to strip out. Not only was this floor huge it was also 6.5m high with 15m rsjs that weighed a massive 3.2 ton each.

The Solution

We completed this project in just 4 weeks despite the number of rounded off screws in the boards.
After dismantling this floor we cut all of the huge floor studs off to ground level.